Not a lot of knitting happening here. Life constantly gets in the way. Picking at the Mystic Waters shawl slowly but steadily though. Decided I don't have time to do the large version so I'll do the small and should be done by the time it's vacation as long as I stay the course. 60% done and a month away.. can I do it? Yes I can! Betcha once I finish it stops raining.. hopefully the mystic part isn't me making it rain, I'd have a loooot of people mad at me..
In other things, I came across this joke today and I just had to share:
A highway patrolman pulled alongside a speeding car on the freeway. Glancing at the car, he was astounded to see that the blonde behind the wheel was knitting!
Realizing that she was oblivious to his flashing lights and siren, the trooper cranked down his window, turned on his bullhorn and yelled, 'PULL OVER!'
'NO!' the blonde yelled back, 'IT'S A SCARF!'
Tomorrow should be fun as I am off to the yarn tasting at the LYS. Can't wait!!
Thursday, June 17, 2010
Saturday, February 27, 2010
Hmm what to update?
So much happening all the time, busy with new friends and old and keeping things sane around the house, but I do manage to squeeze in some knitting now and again!
What's on the needles?

Fiddlehead Mittens, I've finished the outside shell of one, and started the second but not gotten too far as I realized I wanted to finish..

Mystic Waters before I go on vacation, so I can WEAR it. Velociraptor is in swimming lessons now, so that is a whole block of uninterrupted knitting time while he is in the pool I can sit with my knitting and a coffee. The only problem is, with the charts for the above I prefer it as a home project so I bring along with me something a little more portable..

Sunday Swing Socks! Because I have yet to finish a pair since my Saturday Socks (anyone else wondering if there are other days of the week socks? I looked in Ravelry and couldn't find any so I will either need to choose ones and make them for each day of the week or make my own patterns.. hmm..)
And of course because I don't have enough crafts, I was shared a link to this lovely quilt and this quilt along. I have plenty of fabric (mostly cottons) in my bins in my not-yet-set-up sewing room (other bins from my yarn, of course) and I am thinking I need to shuffle my room around, get that darn sewing machine set up and try out some quilting. Just for fun!
I will at some point, not quite this instant though.
And of course today it feels like spring, which has got me thinking of my future garden (the first I'll have that's not just a couple feet of dirt by the front step, good enough only for some pansies and marigolds).
Not enough time for everything!
Oh, and I am debating whether or not to frog Phoenix Rising and start again. There is a MASSIVE MASSIVE mistake in the middle, one even a non-knitter could easily pick out which will only be worse when blocked. So I am seriously considering despite being almost done.
Le sigh.
So much happening all the time, busy with new friends and old and keeping things sane around the house, but I do manage to squeeze in some knitting now and again!
What's on the needles?

Fiddlehead Mittens, I've finished the outside shell of one, and started the second but not gotten too far as I realized I wanted to finish..

Mystic Waters before I go on vacation, so I can WEAR it. Velociraptor is in swimming lessons now, so that is a whole block of uninterrupted knitting time while he is in the pool I can sit with my knitting and a coffee. The only problem is, with the charts for the above I prefer it as a home project so I bring along with me something a little more portable..

Sunday Swing Socks! Because I have yet to finish a pair since my Saturday Socks (anyone else wondering if there are other days of the week socks? I looked in Ravelry and couldn't find any so I will either need to choose ones and make them for each day of the week or make my own patterns.. hmm..)
And of course because I don't have enough crafts, I was shared a link to this lovely quilt and this quilt along. I have plenty of fabric (mostly cottons) in my bins in my not-yet-set-up sewing room (other bins from my yarn, of course) and I am thinking I need to shuffle my room around, get that darn sewing machine set up and try out some quilting. Just for fun!
I will at some point, not quite this instant though.
And of course today it feels like spring, which has got me thinking of my future garden (the first I'll have that's not just a couple feet of dirt by the front step, good enough only for some pansies and marigolds).
Not enough time for everything!
Oh, and I am debating whether or not to frog Phoenix Rising and start again. There is a MASSIVE MASSIVE mistake in the middle, one even a non-knitter could easily pick out which will only be worse when blocked. So I am seriously considering despite being almost done.
Le sigh.
Saturday, January 02, 2010
First Post of 2010
So it's a new year! I'm hoping this year goes as good as (better in fact, because there were some hiccups that I really, really would rather not have had to deal with.. but I'll manage).
On the crafty front, as always there are lots of plans and no real follow through happening. Which is my own fault being so flibbertigibbet and just busy in general. Plans for this year? Finish the sweater for Velociraptor (thank goodness it's a top down and he's skinny!), finish at least one sweater for myself, one shawl and just really actually finish several projects instead of constantly casting on new ones. I have plenty to keep me busy.
Also, I need to set up the knitting/sewing room. It's currently half unpacked and half boxed up. Mostly organized at least as I know what is in what boxes and the needles and notions are unpacked and in my wardrobe. But this way I can maybe display some things that I otherwise haven't been able to for years.
Of course I am also wanting to do some of my Cross-stitch now that I know where it is. Or mostly. I can't seem to locate one chart for the Alluring Sorceress which I think would just be great to make and put up in my craft room. It's one of the ones that has been floating around my stuff and calling to me but I always forget to go get supplies.. well I got a gift card for Michael's and today was wandering around wondering what to buy there. None of the needles appealed to me, the yarns were okay but nothing really cried out especially since I have what.. two large rubbermaid tubs of other yarns that cry out to me 'knit me!'?
Then I found the cross-stitch aisle. TWO. I don't think I've ever seen that much cross-stitch items in one place before and it got me fired up to do that again. So I went digging and found the charms for the sorceress, but not the chart. I know it's here somewhere.. it will turn up. In the meantime, knitting keeps moving on.
On the crafty front, as always there are lots of plans and no real follow through happening. Which is my own fault being so flibbertigibbet and just busy in general. Plans for this year? Finish the sweater for Velociraptor (thank goodness it's a top down and he's skinny!), finish at least one sweater for myself, one shawl and just really actually finish several projects instead of constantly casting on new ones. I have plenty to keep me busy.
Also, I need to set up the knitting/sewing room. It's currently half unpacked and half boxed up. Mostly organized at least as I know what is in what boxes and the needles and notions are unpacked and in my wardrobe. But this way I can maybe display some things that I otherwise haven't been able to for years.
Of course I am also wanting to do some of my Cross-stitch now that I know where it is. Or mostly. I can't seem to locate one chart for the Alluring Sorceress which I think would just be great to make and put up in my craft room. It's one of the ones that has been floating around my stuff and calling to me but I always forget to go get supplies.. well I got a gift card for Michael's and today was wandering around wondering what to buy there. None of the needles appealed to me, the yarns were okay but nothing really cried out especially since I have what.. two large rubbermaid tubs of other yarns that cry out to me 'knit me!'?
Then I found the cross-stitch aisle. TWO. I don't think I've ever seen that much cross-stitch items in one place before and it got me fired up to do that again. So I went digging and found the charms for the sorceress, but not the chart. I know it's here somewhere.. it will turn up. In the meantime, knitting keeps moving on.
Saturday, November 14, 2009
Holiday knitting
I told myself this year I wouldn't.
The last time I did it, I never got all I wanted done and I still have the yarn floating around, AND I want to try and finish some projects I still have on the needles (mainly Phoenix Rising and Mr Greenjeans) so I can move on to some others like Mystic Waters*, Silver Birches or Elsewhere, the latter which I am thinking of spending my birthday money on to buy the yarn for. Madelinetosh..
But my mind keeps insisting. Budget is tight this year.. you have ALL this yarn, and planned to make stuff anyway. Why not make the remaining tea cozies? (Two.) Make some mittens (three pair). That clears away a few people, and they are small projects you can take with you.
But! I no longer bus it. I have lost all that prime knitting time, not only that but if I do take the bus from where I now live I have about five minutes seated then stand the rest of the way. Not conducive to knitting because if you stumble you might stab yourself or a fellow bus rider.
And! And my knitting is all scattered. I have some pieces here, some things there, a couple tubs of rubbermaid to dig through just to find all the needles and yarn I need for it.
But all I can think is how nice it would be to make some people some gloves or mittens for winter.
Bah.
*We're going to the ocean next year, wouldn't it be nice to have the Mystic Waters shawl to keep me cozy?
The last time I did it, I never got all I wanted done and I still have the yarn floating around, AND I want to try and finish some projects I still have on the needles (mainly Phoenix Rising and Mr Greenjeans) so I can move on to some others like Mystic Waters*, Silver Birches or Elsewhere, the latter which I am thinking of spending my birthday money on to buy the yarn for. Madelinetosh..
But my mind keeps insisting. Budget is tight this year.. you have ALL this yarn, and planned to make stuff anyway. Why not make the remaining tea cozies? (Two.) Make some mittens (three pair). That clears away a few people, and they are small projects you can take with you.
But! I no longer bus it. I have lost all that prime knitting time, not only that but if I do take the bus from where I now live I have about five minutes seated then stand the rest of the way. Not conducive to knitting because if you stumble you might stab yourself or a fellow bus rider.
And! And my knitting is all scattered. I have some pieces here, some things there, a couple tubs of rubbermaid to dig through just to find all the needles and yarn I need for it.
But all I can think is how nice it would be to make some people some gloves or mittens for winter.
Bah.
*We're going to the ocean next year, wouldn't it be nice to have the Mystic Waters shawl to keep me cozy?
Monday, October 26, 2009
Once again..
It has been forever. Not a lot of knitting happening, mainly I work at my Phoenix Rising shawl when I get a chance. I only have about 30 odd 46 rows to go, so I really ought to keep working and finish so I can allow myself to work at Silver Birches! I've decided to skip doing one repeat of the edge like some people suggested because I'm not quite sure if I'll have enough yarn as many people were a little short. But it will look lovely when I finally finish and block it out!
Been also crocheting a little, just some basic dish cloths but I prefer the crocheted or knit ones to the store bought, so much sturdier and much more scrubby power.
Lots to life happening, things are just hectic and fun at times but rough at others. But that's life, hey?
Maybe I should work on the knitting and blogging a bit more..
Been also crocheting a little, just some basic dish cloths but I prefer the crocheted or knit ones to the store bought, so much sturdier and much more scrubby power.
Lots to life happening, things are just hectic and fun at times but rough at others. But that's life, hey?
Maybe I should work on the knitting and blogging a bit more..
Wednesday, August 05, 2009
Long time gone..
Man it's been forever since I blogged. Far, far too long. I am a horrible blogger.
What's been happening? Lots of stuff. Next to none of it having to do with knitting. I'm steadily working on Mr Greenjeans, now that I have my gauge I've finally moved on from the top part to the cabling. I'm also working on a sock, a Saturday Sock and the special thing about this one is I'm working on it the way Yarn Harlot showed us in the class she taught at last year's M1 retreat. I think I'm finally getting the motions down, it seems to go faster (at least when knitting, purling just doesn't seem to co-operate much).
That's it for knitting, no finished objects, no pretty pictures (too gloomy this week for pictures and I didn't think of it last week when it was 30+ Celsius).
I'm also working on a craft room! Since we moved I have a nice little corner where I can put my stuff. For now it's full of boxes and bags, my sewing machine (still boxed) and my wardrobe (there's no closet in there to stash stuff). I picked up a table at the flea market for thirty dollars and it's a nice sturdy smallish dining room size table which will be perfect for my sewing machine and laying things out (once I get it too set up). I might even be able to display my porcelain dolls again!
Lots to do though. Back to the plotting and working..
What's been happening? Lots of stuff. Next to none of it having to do with knitting. I'm steadily working on Mr Greenjeans, now that I have my gauge I've finally moved on from the top part to the cabling. I'm also working on a sock, a Saturday Sock and the special thing about this one is I'm working on it the way Yarn Harlot showed us in the class she taught at last year's M1 retreat. I think I'm finally getting the motions down, it seems to go faster (at least when knitting, purling just doesn't seem to co-operate much).
That's it for knitting, no finished objects, no pretty pictures (too gloomy this week for pictures and I didn't think of it last week when it was 30+ Celsius).
I'm also working on a craft room! Since we moved I have a nice little corner where I can put my stuff. For now it's full of boxes and bags, my sewing machine (still boxed) and my wardrobe (there's no closet in there to stash stuff). I picked up a table at the flea market for thirty dollars and it's a nice sturdy smallish dining room size table which will be perfect for my sewing machine and laying things out (once I get it too set up). I might even be able to display my porcelain dolls again!
Lots to do though. Back to the plotting and working..
Monday, April 06, 2009
New Yarn! Maybe?
My Blue Moon Funky Sock Monkey kit (I got 3A Thistle and Cockcrow) is here!
Sort of.
Mom was out today, so no one was home to sign for it and thus my sock monkey kit is currently sitting at the post office. *sobs*
So tomorrow, before I go to knit night, I go to pick it up! Yay!
I decided to go with this instead of the Moroccan Days/Arabian Nights kit as my tax return splurge to myself. Partially because I have a lot of laceweight and many patterns I wish to do (*coughs* Year of Lace, and other things) and because I decided I don't like the purple as much as I thought after all, and I never really liked the yellow. So if I DO do that pattern, I think I'd just buy the pattern and pick up some Knit Picks Shimmer in Spice once it becomes available.
Maybe. We'll see. I have other things to spend money on, and most of it has been tucked away for a rainy day.
I'm back to where I need to take the sleeve stitches off for Mr Greenjeans, working steadily but slowly away at it..
ETA: And dare I say it.. but has Spring finally arrived?
Sort of.
Mom was out today, so no one was home to sign for it and thus my sock monkey kit is currently sitting at the post office. *sobs*
So tomorrow, before I go to knit night, I go to pick it up! Yay!
I decided to go with this instead of the Moroccan Days/Arabian Nights kit as my tax return splurge to myself. Partially because I have a lot of laceweight and many patterns I wish to do (*coughs* Year of Lace, and other things) and because I decided I don't like the purple as much as I thought after all, and I never really liked the yellow. So if I DO do that pattern, I think I'd just buy the pattern and pick up some Knit Picks Shimmer in Spice once it becomes available.
Maybe. We'll see. I have other things to spend money on, and most of it has been tucked away for a rainy day.
I'm back to where I need to take the sleeve stitches off for Mr Greenjeans, working steadily but slowly away at it..
ETA: And dare I say it.. but has Spring finally arrived?
Subscribe to:
Posts (Atom)